Upgrading CPQ from June '25 to February '26 Release
- Go to Setup > Installed Packages and ensure that your current Salesforce org has the packages of CPQ June '25 release or later, which are the minimum required versions for upgrading to February '26 release. Refer to the latest February '26 release or respective patch Release Notes.
- Ensure that you have the following packages and dependent packages to upgrade to the February '26 release. These packages are required to utilize the new features and enhancements of the February '26 release. These are the minimum required versions; later versions are also supported.
Package Latest Certified Version Name Number Conga Approvals (Changed)
17.0.403
17.403
Conga Base Library (Changed)
7.0.288
7.288
Conga Billing (Changed)
12.0.446
12.446
Conga CLM Configuration Integration (Changed)
18.0.200
18.200
Conga Configuration & Pricing (Changed)
18.0.2199
18.2199
Conga Contract Lifecycle Management (Changed)
17.0.815
17.815
Conga CPQ API
17.1.138
17.138
Conga CPQ Approvals
13.2.25
13.25.3
Conga CPQ Maximizer
10.1.0036
10.36
Conga CPQ Setup (Changed)
18.0.176
18.176
Conga Deal Maximizer Setup
8.1.0056
8.56
Conga Deal Maximizer
7.0.0007
7.7
Conga DocuSign API
8.1.142
8.142.42
Conga Order Management
1.0.0000
1.0
Conga Promotions
1.0.0000
1.0
Conga Quote Approvals
7.1.11
7.11
Conga Quote Asset Integration
6.5.0015
6.15
Conga Quote CLM Integration Changed
15.0.88
15.88
Conga Quote Configuration Integration Changed
18.0.423
18.423
Conga Quote DocuSign Integration
4.1.23
4.23
Conga Quote Echosign Integration
4.1.18
4.18
Conga Quote Management (Changed)
16.0.275
16.275
- Perform the upgrade. The upgrade procedure is the same as the installation procedure. For detailed information on installing CPQ managed packages, see CPQ Packages.
- After the upgrade is complete, perform the post-upgrade tasks. For more information, see Performing the Post-Upgrade Tasks.
