Asset Based Operations
You can perform the following operations on an asset when an order is generated. These are known as Asset-Based Operations (ABO)
- Change
- Change: Configuration
- Change: Quantity
- Renew
- Swap
- Terminate
- Resume
- Suspend
Required Settings
- Default Asset Pricing Indicator: When the check box is selected, the base price comes from asset price and when cleared the base price comes from Product Price List (PLI) pricing list.
- Enable Onetime Change=TRUE/FALSE. If this flag is true, then changes can be done on one time-lines.
For information on asset pricing and Product List Item (PLI) pricing, Asset Pricing Criteria
For information on installing CPQ Packages, see Installing the Conga CPQ (RLS) Package
